The two boxes were already in the room.
|
The all equipments are in the boxes.
|
||||
|
|||||
Set up the rigs on a box.
|
AC200V, Rotator controler, and Coaxes
are in the botom of the closet under a cover. |
||||
|
|||||
Wiring the cables to the box.
|
Wiring the coaxes to the rigs.
|
||||
|
|||||
Set the operation desk.
|
Heil ProSet+, Heil hand-mic, Himond keypad
PC, and Clock were brought from JAPAN. |
||||
|
|||||
Yeasu FT-1000MP and VL-1000
(FT-920 is also available, but did not use it.) |
Huge Pile-up from JA, EUs, and Americas
|
||||
|
|||||
The main tower on a hill.
160m : n/a |
Public wireless LAN is available at the lobby.
The backbone throughput is so-so in daytime, but very poor in evening. |
||||